01Live now
Smart Privacy Systems
02Coming soon
Aluminium Partition Systems
03Coming soon
Art Glass Systems
Compare · same active film

Smart Film vs Smart Glass.

Two integration methods. One switchable PDLC active film. Pick by project context — we route the right product. Same FM-T91 PDLC, applied two ways: self-adhesive retrofit, or EVA-laminated assembly.

Active filmFM-T91 (same)
Switching< 1 second
Decision aid2 working days
FILM VS GLASS PRIVASEE SMART FILM Self-adhesive · retrofit SMART GLASS EVA-laminated assembly Same FM-T91 active film · two methods
The fast read

If you have existing glass, it's Smart Film.

If you have existing glass and want switchable privacy without changing it, Smart Film is the answer. If you're specifying a new build and want the active film sealed inside the glass for a long service life, Smart Glass is the answer. Both use the same FM-T91 active film.

Side-by-side

Two cards. Pick the integration method.

Both use the same FM-T91 PDLC active film. Both deliver < 1 second switching, ≥ 90% clear VLT, and ≥ 7–10 years service life. The difference is how the film is integrated.

Self-adhesive · retrofit
SELF-ADHESIVE · RETROFIT

Smart Film

Switchable PDLC film applied directly onto your existing interior glass — no glass swap needed. Same-day install onto vertical interior partitions, meeting rooms, retail vitrines, consultation spaces. Fast, accessible, fully reversible.

  • Active film: FM-T91 PDLC
  • Integration: Self-adhesive backing, applied to room-side face
  • VLT clear (powered): ≥ 90% (EN 410 · ISO 9050)
  • VLT opaque (un-powered): ≥ 80% (EN 410 · ISO 9050)
  • Haze clear / opaque: ≤ 2.5% / ≥ 99% (ASTM D1003)
  • Switching time: < 1 second
  • Glass change required: No
  • Mounting context: Existing interior glass
  • Service life: ≥ 7–10 years indoor commercial
Best for: Tenant-improvement fit-outs · retrofit programmes · timeline-sensitive projects · reversible installations.
Explore Smart Film
Hero · premium architectural 14.0 mm SG-01
EVA-LAMINATED · PREMIUM

Smart Glass

PDLC film sealed inside two tempered low-iron glass panes with PRIVASEE-specified EVA interlayer. A complete laminated assembly engineered for new construction, façades, framed walls, acoustic-rated boardrooms, and bespoke architectural builds.

  • Active film: FM-T91 PDLC (same as Smart Film)
  • Integration: EVA-laminated between two tempered low-iron glass panes
  • VLT clear (powered): ≥ 90% (EN 410 · ISO 9050)
  • VLT opaque (un-powered): ≥ 80% (EN 410 · ISO 9050)
  • Haze clear / opaque: ≤ 2.5% / ≥ 99% (ASTM D1003)
  • Switching time: < 1 second
  • Glass change required: Yes (the Smart Glass IS the glass)
  • Mounting context: New build · façade · framed · DGU · skylight · curved
  • Service life: ≥ 7–10 years indoor commercial
Best for: New construction · premium architectural projects · acoustic-rated interiors · wet-risk environments · acoustic and structural specifications.
Explore Smart Glass
Full matrix

Spec-by-spec.

Twenty rows. Same active film. Where the two products differ is in integration, compliance, and project context.

SpecSmart FilmSmart Glass
Active filmFM-T91 PDLCFM-T91 PDLC (same)
IntegrationSelf-adhesive · retrofitEVA-laminated assembly
VLT clear (powered)≥ 90%≥ 90%
VLT opaque (un-powered)≥ 80%≥ 80%
Haze clear≤ 2.5%≤ 2.5%
Haze opaque≥ 99%≥ 99%
Switching time< 1 second< 1 second
Glass change requiredNoYes — Smart Glass replaces existing glass
Safety glassExisting substrate must already be safety glassBuilt-in: tempered low-iron both panes
Laminated glazing standardn/a (film on existing glass)BS EN 14449 · EN 12150 · BS 6206 · ISO 12543-5
Acoustic-rated build availablen/aYes — LG-02 (numeric Rw / STC values supplied where independent test evidence is available)
Glass writing surfaceNot supportedSupported with approved dry-erase / glass-board markers + IPA 70% cleaning (warnings apply)
Enhanced water protection (wet-risk)Limited to dry-side privacyEngineered with edge-seal protection
Mounting contextExisting interior glassNew build · framed · façade · DGU · skylight · curved
Custom configurationsRoll lengths · widths8 engineered build paths (Custom Configurations Catalogue)
Lead time UAEEx-stock + production 4–6 weeks for non-stockEx-stock SG-01 + production 4–6 weeks for custom
Lead time UKLaunching · production 4–6 weeks + freightLaunching · production 4–6 weeks + freight
Warranty (panel)24 months24 months
Warranty (hardware)12 months12 months
Best-fit project typeRetrofit · tenant-improvement · timeline-sensitiveNew build · premium architectural · acoustic · wet-risk
Same FM-T91 active film. Integration method differs. Price and lead time differ as a result.
When to specify which

Six briefs · six verdicts.

The same FM-T91 active film fits both retrofit and new-build briefs. Project context decides which product PRIVASEE engineering routes you to.

Verdict · Smart Film

Tenant-improvement office fit-out

Existing partitions, fast install, reversible. Same-day rollout onto interior glass without facility shutdown.

Verdict · Smart Film

Healthcare clinic retrofit

No facility shutdown, easy clean, fully reversible. Patient-privacy on demand with IPA 70% workflow.

Verdict · Smart Film

Retail vitrine · multiple bays

Roll-out scale, no glass swap per bay. Switchable visual merchandising across whole-store programmes.

Verdict · Smart Glass · LG-02

New-build boardroom (acoustic-rated spec)

Acoustic-rated build path · engineered laminated assembly. Rw values supplied where independent test evidence is available.

Verdict · Smart Glass · SG-01

Hotel bath divider (wet-risk)

Enhanced water protection · sealed assembly. Engineered edge-seal for bathroom, dressing room, spa environments.

Verdict · Smart Glass · Custom Config

Premium villa skylight or curved partition

Engineered build paths for overhead, curved, coloured, printed, DGU and multi-zone applications.

The honest decision aid

If you're still not sure.

Send us the brief — new build vs. retrofit, room context, panel sizes, the acoustic or wet-risk spec lines if any. PRIVASEE® engineering routes the right product within 2 working days. Customers don't pick the SKU from a website table — we engineer it. The two-product question is just the first decision; from there we configure to your project.

One brief · two working days

One brief. Right product. Two working days.

Send drawings, photos, panel schedule. We come back within 2 working days with the right Smart Film or Smart Glass routing, indicative pricing band, and lead time. For architect-grade specifications, we also send the drop-in spec line.